In the wood production process, the load fluctuations of major processes such as cutting, gluing, and grinding are large. In order to smooth the load curve, the customer installed 300kWp PV and 250kW/500kWh BESS in the factory. The inverter used was MEGAREVO’S  MPS0250. Since the system was put into operation, the factory has followed one charge-discharge operation strategy every day, allowing the BESS to charge during valley price periods and discharge during peak price periods, further improving the efficiency of overall energy management and greatly saving electricity expenses.